RENOVATION -- WEST CAMPUS ALLIED HEALTH BUILDING


Print

The renovation of the Allied Health Building will include renovation of existing instructional spaces for Medical Lab Tech, Radiography, Pharmacy Technician, Respiratory Care, and Nuclear Medicine, as well as the creation of a new Sonography Laboratory. Classrooms and offices for Allied Health and Child Development will be in the area vacated by the Dental Clinic.

The project includes minor modifications to existing classroom, laboratory and office spaces (i.e., replacement of casework), as well as demolition of the interior partitions, finishes and fixtures of the area which once housed the Dental Clinic and renovation and reconfiguration of this space for general use by the Allied Health Division and the Early Childhood Development department.

Renovated spaces will include laboratories, general classrooms, faculty offices and specialized support spaces such as x-ray facilities.



A new north entrance to the Allied Health Building is constructed.


 

           New North Entrance -- Allied Health                      

 



Workers prepare for the renovation.


Iron workers cutting and grinding.

                                                      

                                                        Unloading HVAC duct.

Electrician preparing for work. 

 

                                            



Renovations continue inside the building.


08 Allied Health 06a Allied Health  HVAC Ironworker.JPG
   
12 Allied Health  Plumbing 2.JPG 11 Allied Health Plumbing 1.JPG

                                             



Electrician putting in wire for automatic door opener                 10 Allied Health
     
Electrician   Allied Health

 



Installing HVAC Insulation              07 Allied Health Electricians.JPG
New insulation is put in place.    
10 Allied Health  Framer.JPG   Glazer putting in new windows in Allied Health
    New windows are installed.
New Flooring in the Sim Lab   Painting the Allied Health Building
New flooring is installed in the Simulation Lab and the Respiratory Lab.   Walls are painted.

 



Entrance on the southwest side of the building is improved.


             

                                        Southwest Entrance to the Allied Health Building                                                     
  Secruity wiring for electronic locks is installed.  

 



Renovation continues on the roof of the Allied Health Building.


Plumbers cutting & threading pipe for gas line on roof Allied Health
Plumbers cutting & threading pipe for gas line on roof. Plumber on roof running gas lines for heaters.

                                       Allied Health



Renovations are near completion in classrooms.


Allied Health Nov 2011 005.JPG Allied Health Nov 2011 010.JPG
New furniture arrives to place in renovated rooms. A new employee breakroom is near completion.
Allied Health Nov 2011 007.JPG
A classroom is installed with smart audio visual technology capabilities.
Allied Health Nov 2011 012.JPG Allied Health Nov 2011 013.JPG Medical air compressor is installed.
Water heater is installed in new equipment room.    
     

 



Renovations continue in the Radiography and Pharmacy Labs.


Allied Health  Allied Health
 The Pharmacy Lab is remodeled. The Radiography Lab is remodeled.
Allied Health Allied Health

Allied Health

IT Cables are installed in the corridor for the Radiography and Pharmacy Labs.

Allied Health

The Commons area is renovated.



A new state-of-the-art Gamma Camera is installed for use in the Nuclear Medicine Technology Program.


 

Gamma Camera

Gamma Camera



A new state-of-the-art X-Ray Machine is installed for use in the Radiography Program.


Allied Health X-Ray Machine Allied Health X-Ray Machine

 



Renovations are near completion.


Allied Health                                         Allied Health
Allied Health Commons                                Allied Health New Floors
   
Allied Health Commons Allied Health New classroom
   
Allied Health renovations  

 



The Allied Health Building renovations are complete.


                              Common Lobby                     
                                                New Classrooms  
   
               
           

 



New state of the art labs are complete in the Allied Health Building.


Medical Lab

Pharmacy Lab

Sim Lab

Respiratory Lab



 

 

Back to Top                 
Return to Home

To Science Laboratory Building
To Steven W. Jones Hall       
To Washington Campus Parking Lot
To Warren Hall       
To West Campus B Building       
To Chiller Loop
To Byrd Business / Parcells Hall
To Dutton Hall
To Allied Health
To Polk Street Parking Lot
To Music Building
To Transportation Career Center
To Manufacturing Education Center
To Lynn Library
To Proposed Budget
To Project Timelines
To Proposed Project List
To Shiver-Megert Architects
To Page & Associates Contractors
To Site Index