Polk Street Parking Lot


Print

 

As part of the continuing bond projects, a new parking lot will be constructed on the south side of the Downtown Campus. This parking lot will conform to the City of Amarillo's downtown master planning initiative.  The new parking lot will create a walkable environment compatible with the Downtown Amarillo Urban Design Standards.



Polk Street Parking Lot



  Old Tennis Courts south of Polk Street Campus  
  Polk Street Parking Lot  
     

 



Construction Crew begins work on the new parking lot.


Polk Street Parking Lot 2012 1 6 006.JPG



Polk Street Parking Lot 2012 1 6 008.JPG  

 



Polk Street Parking Lot 2012 1 6 012.JPG  
Polk Street Parking Lot 2012 1 6 010.JPG  
Polk Street Parking Lot 2012 1 6 007.JPG  

 



Construction on the new parking lot continues.


Downtown Parking Lot     Downtown Parking Lot
     
Downtown Parking Lot   Downtown Parking Lot
     
Downtown Parking Lot   Downtown Parking Lot
     
Downtown Parking Lot   Downtown Parking Lot
     
Downtown Parking Lot   Downtown Parking Lot

 



Sidewalks and pedestrian lights are installed around the parking lot.


Polk Street Parking Lot Pedestrian Signs



The parking lot is screened with brick and wrought iron fencing.


Brick fencing around the parking lot



The parking lot is prepared for signage and landscaping.


 

 

 

Amarillo College Sign

Preparations for landscaping



New trees are planted.


 

 

Polk Street Parking Lot  -- New Trees

 

                                   

Polk Street Parking Lot  -- New Trees
     
     

 

 



Polk Street Parking Lot  -- New Trees

Polk Street Parking Lot  -- New Trees

 

Polk Street Parking Lot  -- New Trees



The parking lot is paved.


Paving     Paving
     
Paving   Paving
     
Paving   Paving

 



Paving

 

Striping

Striping

Paving

 



Return to Home

To Science Laboratory Building
To Steven W. Jones Hall       
To Washington Campus Parking Lot
To Warren Hall       
To West Campus B Building       
To Chiller Loop
To Byrd Business / Parcells Hall
To Dutton Hall
To Allied Health
To Polk Street Parking Lot
To Music Building
To Transportation Career Center
To Manufacturing Education Center
To Lynn Library
To Proposed Budget
To Project Timelines
To Proposed Project List
To Shiver-Megert Architects
To Page & Associates Contractors
To Site Index