The renovation of the Allied Health Building will include renovation of existing instructional spaces for Medical Lab Tech, Radiography, Pharmacy Technician, Respiratory Care, and Nuclear Medicine, as well as the creation of a new Sonography Laboratory. Classrooms and offices for Allied Health and Child Development will be in the area vacated by the Dental Clinic.
The project includes minor modifications to existing classroom, laboratory and office spaces (i.e., replacement of casework), as well as demolition of the interior partitions, finishes and fixtures of the area which once housed the Dental Clinic and renovation and reconfiguration of this space for general use by the Allied Health Division and the Early Childhood Development department.
Renovated spaces will include laboratories, general classrooms, faculty offices and specialized support spaces such as x-ray facilities.
|
Iron workers cutting and grinding. | Unloading HVAC duct. | |
Electrician preparing for work. |
New insulation is put in place. | ||
New windows are installed. | ||
New flooring is installed in the Simulation Lab and the Respiratory Lab. | Walls are painted. |
Security wiring for electronic locks is installed. |
Plumbers cutting & threading pipe for gas line on roof. | Plumber on roof running gas lines for heaters. |
New furniture arrives to place in renovated rooms. | A new employee breakroom is near completion. |
A classroom is installed with smart audio visual technology capabilities. |
Medical air compressor is installed. | |||
Water heater is installed in new equipment room. |
| ||
The Pharmacy Lab is remodeled. | The Radiography Lab is remodeled. | |
Common Lobby |
New Classrooms | ||