RENOVATION -- WEST CAMPUS ALLIED HEALTH BUILDING

The renovation of the Allied Health Building will include renovation of existing instructional spaces for Medical Lab Tech, Radiography, Pharmacy Technician, Respiratory Care, and Nuclear Medicine, as well as the creation of a new Sonography Laboratory. Classrooms and offices for Allied Health and Child Development will be in the area vacated by the Dental Clinic.

The project includes minor modifications to existing classroom, laboratory and office spaces (i.e., replacement of casework), as well as demolition of the interior partitions, finishes and fixtures of the area which once housed the Dental Clinic and renovation and reconfiguration of this space for general use by the Allied Health Division and the Early Childhood Development department.

Renovated spaces will include laboratories, general classrooms, faculty offices and specialized support spaces such as x-ray facilities.

A new north entrance to the Allied Health Building is constructed.


 

           New North Entrance -- Allied Health                      

 


Workers prepare for the renovation.

 


 

        
Iron workers cutting and grinding. Unloading HVAC duct.
  
Electrician preparing for work.  

 

      

Renovations continue inside the building.


08 Allied Health  06a Allied Health  HVAC Ironworker.JPG
   
12 Allied Health  Plumbing 2.JPG 11 Allied Health Plumbing 1.JPG

                

 

Electrician putting in wire for automatic door opener               10 Allied Health
   
Electrician  Allied Health

 

 

Installing HVAC Insulation            07 Allied Health Electricians.JPG
New insulation is put in place.  
10 Allied Health  Framer.JPG Glazer putting in new windows in Allied Health
  New windows are installed.
New Flooring in the Sim Lab Painting the Allied Health Building
New flooring is installed in the Simulation Lab and the Respiratory Lab. Walls are painted.

Entrance on the southwest side of the building is improved.


             

                                       Southwest Entrance to the Allied Health Building                                                    
 Security wiring for electronic locks is installed. 

Renovation continues on the roof of the Allied Health Building.


Plumbers cutting & threading pipe for gas line on roof  Allied Health
Plumbers cutting & threading pipe for gas line on roof. Plumber on roof running gas lines for heaters.

                                       Allied Health

 

 

Renovations are near completion in classrooms.

 

 


Allied Health Nov 2011 005.JPG  Allied Health Nov 2011 010.JPG
New furniture arrives to place in renovated rooms. A new employee breakroom is near completion.
Allied Health Nov 2011 007.JPG
A classroom is installed with smart audio visual technology capabilities.
Allied Health Nov 2011 012.JPG  Allied Health Nov 2011 013.JPGMedical air compressor is installed.
Water heater is installed in new equipment room.   

Renovations continue in the Radiography and Pharmacy Labs.


Allied Health      Allied Health
   
 The Pharmacy Lab is remodeled. The Radiography Lab is remodeled.
Allied Health Allied Health

Allied Health

 

Allied Health

 

A new state-of-the-art Gamma Camera is installed for use in the Nuclear Medicine Technology Program.


 

Gamma Camera

Gamma Camera

 

A new state-of-the-art X-Ray Machine is installed for use in the Radiography Program.


Allied Health X-Ray Machine    Allied Health X-Ray Machine

Renovations are near completion.


Allied Health                                          Allied Health
Allied Health Commons                                Allied Health New Floors
   
Allied Health Commons  Allied Health New classroom
   
Allied Health renovations  

The Allied Health Building renovations are complete.


  
                              Common Lobby                     
                                               New Classrooms 
  
   
              
   
          

New state-of-the-art labs are complete in the Allied Health Building.