Manufacturing Education Center -- East Campus Renovation

This renovation project will include a new addition that provides an elevator with new restrooms on both floors. Office areas will be completely renovated and lab areas will be enlarged. The electrical system will be completely renovated. New rooftop HVAC units and unit heaters will be installed that will eliminate an old boiler system. New windows will be installed around the perimeter of the building, and new lighting will be installed throughout the building for better energy efficiency. Also, this facility will be brought up to current ADA standards.


Renovations begin.

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V

Building V


New doorways are framed.

Building V

Building V


Renovations continue throughout the building.

Building V

Building V

Building V

Building V

Building V

 

 


New walls start to go back up.

Building v

Building V

Building V


The ground is prepared for the installation of a new elevator.

Building V

Building V


The new elevator and stairwell take shape as construction continues.

New Elevator

New Elevator

Building V

Building V

Building V


New plumbing is installed on the south side of Building V.

New Plumbing


Progress is made on the new elevator and stairwell.

Elevator

Stairwell to Elevator - North Side Addition


Renovations continue throughout the building.

September 26  2012 009.JPG

Electrical Room

Light Fixtures

Electrical Panels

Paint

Paint

Building V

Building V

Building V

Building V

Building V

Building V elevator


The new addition for the elevator and restrooms is near completion.

2013 4 10 Building V 400 1

New addition for Elevator and Restrooms


Classrooms are completed on the 2nd floor.

2nd Floor Classroom

2nd Floor Classroom


The east side of the 1st floor renovations are near completion.

2013 4 10 Building V 002 300 1

Building V Office

Welcome Center

Building V Breakroom


Renovations on the west side of the building continue.

June 3rd  2013 MEC 054 resized

June 3rd  2013 MEC 051 resized

Manufacturing Education Center

Manufacturing Education Center

June 3rd  2013 MEC 053 resized

Manufacturing Education Center

June 3rd  2013 MEC 055 resized

Manufacturing Education Center

Manufacturing Education Center

June 3rd  2013 MEC 052 resized


New signage is put in place on the Manufacturing Education Center.

MEC9