CONSTRUCTION PROCESS - SCIENCE LABORATORY BUILDING

In October 2008, construction began for the Science Laboratory Building. Contractors created a staging area and begin bringing in heavy equipment to clear obstacles and prepare the site.
 

     
   
  

 

 

 

 

Trenches were created to lay lines needed for service to the new facility.

 


 

 

 

 

Preparation began for the building foundation, soil was compacted and concrete poured.

 

 


 

 

 

 

These footings will support the three story structure.

 

 


 

 

 

 

 

 A vapor barrier was placed then slab reinforcement installed.

A concrete pump truck is used to pour the first floor slab.

 

 

Steel was delivered and off-loaded with a crane.

 

 

 Lifts will be used to erect the steel structure.

Steel columns are placed.

 


 

 

 

 

 

 

 

The building structure continues to take shape.

 


 

 

 

 

Construction of the second floor.

 


 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

Concrete is poured for the first floor.

 

 

The new structure is directly adjacent to the existing Warren Hall building.

 

 

 


 

 

 

Crews pour the second floor slab.

 

 


 

Wall framing is constructed.

 



 

 

 

 

Construction proceeds on all floors.

 

 


 

     
   
  
   
  
   

 

Outside work progresses.

 


  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     
   

 

 
    
   
 

 

 

 

Finishing work continues inside and out.

 

 


 

    
   
 
 

 

 

 

    
   
 
   
  
   
 

 

Moving into new laboratories.

 

 


      
   
 
   
 

 

Inside the Science Laboratory Building.

 


Science Laboratory Building 014.JPG Science Laboratory Building 011.JPG
   
Science Laboratory Building 017.JPG Science Laboratory Building 022.JPG
   
Science Laboratory Building 013.JPG  Science Laboratory Building 015.JPG
   
Science Laboratory Building 020.JPG Science Laboratory Building 007.JPG
   
Science Laboratory Building 018.JPG Science Laboratory Building 016.JPG
   

 

 

 

Back to Top     
Return to Home            
To Science Laboratory Building
To Steven W. Jones Hall       
To Washington Campus Parking Lot
To Warren Hall       
To West Campus B Building       
To Chiller Loop
To Byrd Business / Parcells Hall
To Dutton Hall
To Allied Health
To Polk Street Parking Lot
To Music Building
To Transportation Career Center
To Manufacturing Education Center
To Lynn Library
To Proposed Budget
To Project Timelines
To Proposed Project List
To Shiver-Megert Architects
To Page & Associates Contractors
To Site Index