Renovation -- Warren Hall
Renovations occurring in Warren Hall will include adapting spaces to be shared by the Biology and Physical Science departments. Spaces include new classrooms, a conference room, and a student study center.
- Areas of the second floor will be converted into six 24 – 30 student classrooms. The classrooms will allow for flexibility and give instructors a variety of classroom layouts.
- One of the six new classrooms will be equipped with demonstration capabilities, with a fixed teaching station with water, sink, and gas outlets.
- Shared support spaces include an office suite, a conference room to accommodate faculty and staff, as well as student organizations.
- A new student study center will have a variety of student resources; two break-out rooms that can be used for tutoring, group study, or other uses.
- In addition, several storage rooms will be provided for general departmental storage and lecture material storage.

Several spaces in Warren Hall building are not being affected or renovated for the project. Some spaces will be reused for different functions.

Renovations begin with asbestos and demolition work.
Renovations continue inside and out.
Renovations are complete.
Inside Warren Hall.